Monitoring Cathodic Protection Effectiveness and Recordkeeping 7:6
CP 1 – Cathodic Protection Tester Course Manual
© NACE International, 2000
07/01/04
You need to be familiar with what these maps show and be able to work
with them in the field.
Documentation of your work is essential. Those responsible for updating
facility maps will depend on your information to keep the maps current or
to generate new maps. Consequently, as-built drawings of corrosion control
installations must be accurate. Likewise, if you are involved with repairs of
structures or corrosion control components, accurate information must be
turned in. Accuracy in your work documentation is just as important as
accuracy in your data sheets, as discussed above under “Data Sheets.”