EasyManua.ls Logo

Oracle SPARC T8-1 - Attach Power Cords; Power On the Server (Oracle ILOM)

Oracle SPARC T8-1
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attach Power Cords
Related Information
“Remove the Server From the Rack” on page 52
“Attach Power Cords” on page 159
Attach Power Cords
1.
Attach both power cords to the power supplies.
Note - As soon as the power cords are connected to a power source, standby power is applied in
the server. Depending on how the firmware is configured, the server might boot at this time.
2.
Power on the server.
See “Power On the Server (Oracle ILOM)” on page 159 or “Power On the Server (System
Power Button)” on page 160.
Related Information
“Power On the Server (Oracle ILOM)” on page 159
“Power On the Server (System Power Button)” on page 160
Power On the Server (Oracle ILOM)
Type this command at the Oracle ILOM prompt.
-> start /System
You will see an alert message on the system console. This message indicates that the server is
reset.
Related Information
“Power On the Server (System Power Button)” on page 160
“Clear a Fault Manually” on page 37
Returning the Server to Operation 159

Table of Contents

Other manuals for Oracle SPARC T8-1

Related product manuals