EasyManua.ls Logo

Oracle X7-2 - Page 143

Oracle X7-2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation Checklists
Logistics Checklist Considerations
Yes No N/A Comment
Is there a time constraint on dock access? If yes, then
the provide time constraints.
Is a tail lift required of the delivery carrier to unload the
equipment at the delivery dock?
Will any of the following items be required to place
equipment in the computer room?
Stair walkers
Lifters
Ramps
Steel plates
Floor covers
Does the delivery carrier require any special equipment,
such as non-floor damaging rollers, transport dollies,
pallet jacks, or fork lifts?
Related Information
“Server Physical Specifications” on page 13
“Receiving and Unpacking Requirements” on page 14
Oracle Server X7-2 Service Manual
Oracle Server X7-2L Service Manual
Oracle Server X7-2 Safety and Compliance Guide
Oracle Server X7-2L Safety and Compliance Guide
Site Planning Checklists 143

Table of Contents

Other manuals for Oracle X7-2

Related product manuals