Preparation Checklists
Logistics Checklist Considerations
Yes No N/A Comment
Is there a time constraint on dock access? If yes, then
the provide time constraints.
Is a tail lift required of the delivery carrier to unload the
equipment at the delivery dock?
Will any of the following items be required to place
equipment in the computer room?
■ Stair walkers
■ Lifters
■ Ramps
■ Steel plates
■ Floor covers
Does the delivery carrier require any special equipment,
such as non-floor damaging rollers, transport dollies,
pallet jacks, or fork lifts?
Related Information
■
“Server Physical Specifications” on page 13
■
“Receiving and Unpacking Requirements” on page 14
■
Oracle Server X7-2 Service Manual
■
Oracle Server X7-2L Service Manual
■
Oracle Server X7-2 Safety and Compliance Guide
■
Oracle Server X7-2L Safety and Compliance Guide
Site Planning Checklists 143