EasyManua.ls Logo

Oracle X7-2 - Connecting Cables and Applying Power; Cabling Requirements

Oracle X7-2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting Cables and Applying Power
This section contains procedures for connecting data management and server management
cables and power cords to the server.
“Cabling Requirements” on page 71
“X7-2 Back Panel Connectors and Ports” on page 72
“X7-2L Back Panel Connectors and Ports” on page 73
“Preparing for Installation and Power On” on page 78
“Logging In to Oracle ILOM and Powering On the Server” on page 79
Related Information
“Installation Procedure Overview” on page 11
“Using Oracle ILOM” on page 83
Cabling Requirements
Read the following cable requirements for connecting the server.
Minimum cable connections for the server:
At least one server on-board Ethernet network connection (NET port)
Serial management port (SER MGT): Service Processor (SP) local connection for
Oracle ILOM boot messages
Power cables for the server power supplies
SP management ports:
The SER MGT port uses an RJ-45 cable and is always available. This port is the default
connection to the Oracle ILOM SP.
The network management port (NET MGT) is the optional connection to the Oracle
ILOM SP. The NET MGT port is configured to use DHCP by default. To set a static
IP address, see “Modifying Network Settings” on page 88. The SP network
management port uses an RJ-45 cable for a 10/100/1000 BASE-T connection.
Connecting Cables and Applying Power 71

Table of Contents

Other manuals for Oracle X7-2

Related product manuals