EasyManua.ls Logo

Oracle X7-2 - Page 59

Oracle X7-2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the Cable Management Arm (Optional)
a.
Align connector C with the slide-rail so that the locking spring (callout 1) is
positioned inside (server side) of the right slide-rail [frame 1].
Callout Description
1 Connector C locking spring
b.
Insert connector C into the right slide-rail until it locks into place with an
audible click [frames 2 and 3].
c.
Gently tug on the right side of the CMA back slide bar to verify that
connector C is properly seated.
Installing the Server Into a Rack 59

Table of Contents

Other manuals for Oracle X7-2

Related product manuals