EasyManua.ls Logo

Oracle X7-2 - Page 62

Oracle X7-2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install the Cable Management Arm (Optional)
d.
Verify that the CMA extends fully with the slide-rails.
13.
To return the server to the rack:
a.
Simultaneously pull and hold the two green release tabs (one on each side
of the server) toward the front of the server while you push the server into
the rack. As you push the server into the rack, verify that the CMA retracts
without binding.
62 Oracle Servers X7-2 and X7-2L Installation Guide • October 2017

Table of Contents

Other manuals for Oracle X7-2

Related product manuals