EasyManua.ls Logo

Oracle X7-2 - Page 69

Oracle X7-2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Remove the Cable Management Arm
b.
Use your right thumb to pull the connector A release lever to the right, away
from the left slide-rail (callout 1), and use your left hand to pull the connector
out of the slide-rail [frames 1 and 2].
Callout Description
1 Connector A release lever
8.
Remove the CMA from the rack and place it on a flat surface.
9.
Go to the front of the server and push it back into the rack.
Related Information
“Install the Cable Management Arm (Optional)” on page 54
Installing the Server Into a Rack 69

Table of Contents

Other manuals for Oracle X7-2

Related product manuals