EasyManua.ls Logo

Oshkosh M1070 - Operator Maintenance - Winch Operation; Preparation to Operate Winch

Oshkosh M1070
832 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATOR MAINTENANCE
WINCH OPERATION
INITIAL SETUP:
Materials/Parts
Plug, Ear (WP 0116, Table 1, Item 47)
Personnel Required
Operator and Assistant - - - (2)
PREPARATION TO OPERATE WINCH
NOTE
Model A dash panel shown, Model B dash panel similar.
Both winches are required to load and unload the M1000 trailer.
However, vehicle recovery operations can be performed using only
one main winch.
1. Start engine. (WP 0037)
CAUTION
HET Tractor must be positioned in a straight line with trailer. Failure to
comply may damage winch cable.
2. Position HET Tractor on solid ground so tires have good traction. Position HET Tractor
for straight pull.
3. Turn on beacon light switch (1).
TM 9-2320-360-10 0035
0035-1

Table of Contents

Related product manuals