EasyManua.ls Logo

Oshkosh M1070 - Page 632

Oshkosh M1070
832 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 1. PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
Figure 17.
2. Oil all pivot points, springs, and
locking linkage with OE/HDO
(refer to Lubrication Instructions).
(WP 0106)
3. Clean fifth wheel jaws (2) and
coat with GAA. (WP 0106)
13 Weekly Winch
Hydraulic
System
1. Check all hydraulic hoses (1) for
obvious damage, rotting,
chafing, loose fittings, and leaks.
Any Class
III leakage
evident.
TM 9-2320-360-10 0103
0103-28

Table of Contents