193
Conguring the Hybrid GHP/EHP control
Setting
Registering the gas demand point inputs
[Register gas demand point]
Register the Di terminal of the main unit or the communication adaptor that inputs the gas demand point
when an external equipment is connected.
4
Select the Di terminal of the main unit or
communication adaptor from the list at
right (4-1) and touch [Select] (4-2).
z Set the demand points (“Gas Demand Lv1”, “Gas Demand
Lv2”, and “Gas Demand Lv3”).
z You can change the names displayed for each of
the demand points. Touch the text box and change
with the touchscreen keyboard. (Enter a name up to
16 alphanumeric characters)
4-
1
4-
2
5
Touch [Register].
z To cancel the settings, touch [Cancel].
5
1
Touch [System Settings] in “Settings”.
z The “System settings” screen is displayed.
1
2
Touch [Hybrid GHP/EHP settings].
z Enter the identication number (password level 1 or 2) and
the “Hybrid GHP/EHP settings” screen is displayed.
2
3
Touch [Register gas demand point].
z The “Register gas demand point” screen is displayed.
3