EasyManua.ls Logo

Parker AC15 Series - Initial Steps; Unpacking the Product

Parker AC15 Series
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DOC-0017-03-EN: AC15 Series - Hardware Installation Manual
DOC-0017-03-EN-B 04.04.2023 11 (125)
Initial Steps
Use this Hardware Installation Manual to help plan the following:
1. Installation
Know your requirements:
- Certification, i.e. CE, UL, CUL compliance (Chapter 11: Compliance).
- Conformance to local installation requirements.
- Supply and Cabling requirements (Chapter 6: Installation).
2. Motor Considerations
It is important to consider that:
- The motor used with the Inverter is suitable for Inverter duty.
- The rated current of the motor used with the Inverter is not less than 25% of the Inverter
current rating. It this is the case, poor motor control or autotune problems may occur.
Unpacking the Product
When unpacking the product:
- Save the packaging. In case of the need to return the product, improper packaging can result in
transit damage.
- Use safe and suitable lifting procedure when moving the unit. Never lift the unit by its terminal
connections.
- Prepare a clear, flat surface to receive the inverter before attempting to move it. Do not damage
any terminal connections when putting the unit down.
- Refer to ‘Chapter 6: Installation’ for further details on handling the products.

Table of Contents

Related product manuals