2
Overview
Base width 150, Ledger Heavy Duty
UHV 150 Plus 3
Base width 250 cm, Ledger Heavy Duty
UHV 250 Plus 4
Main components 5
Key 6
Presentational reference 6
Introduction
Target groups 7
Additional technical documentation 7
Intended use 8
Instructions on use 8
Cleaning and maintenance instructions 9
Safety instructions
Cross-system 10
System-specific 11
Storage and transportation 11
Identification markings 12
Laws and regulations 12
Inspection, hand-over and utilisation 13
Base width 150 cm
A1
Assembling the base with Ledger UHV 150
Base level 14
Standards and Ledgers 15
Attachment of base level 16
Attachment of Standards and Ledgers 17
Access decks, decking and guardrails 18
Stability 19
A2 Assembly of Extensions
Standards and Ledgers 20
Access decks, decking and guardrails 21
Additional levels 22
A3 Pressure-resistant ties 23
A4 Dismantling
Recommendation 24
Base width 250 cm
B1
Assembling the base with Ledger UHV 250
Base level 26
Standards and Ledgers 27
Attachment of base level 28
Attachment of Standards and Ledgers 29
Access decks, decking and guardrails 30
B2 Assembly of Extensions
Standards and Ledgers 31
Access decks, decking and guardrails 32
Stability 33
Additional levels 34
B3 Pressure-resistant ties 35
B4 Dismantling
Recommendation 36
Application
C1 Overview
Base width 150 cm 38
Base width 250 cm 39
C2 Actions 40
C3 Reaction forces 41
C4 Anchors, anchor forces 42
C5 Ballast 43
Working Safety
D1 Moving by crane 44
D2 Working on the reinforcement scaffold 45
D3 Assembly with guardrail in advance 46
Variants
E1 Optional/alternative components 47
E2 Scaffold width 100 cm
Base width 150 cm 48
Base width 250 cm 49
E3 Bay length 300 cm
Scaffold width 75 cm 50
Scaffold width 100 cm 51
E4 Base Beam UVA 250 52
E5 Hatch UAF 53
E6 Coupler Braces UBC 54
E7 External stairs 55
Components
PERI UP Flex Reinforcement Scaffold
75 and 100 56
Supplemental pages
PERI UP Flex 2nd generation
l - VIII
Content
PERI UP Flex Reinforcement Scaffold 75 and 100
Instructions for Assembly and Use – Standard Configuration