36
B4 Dismantling
Recommendation
Warning
Risk of falling!
During work operations, keep the
hatch closed.
Use PPE to prevent falling.
Following the completion of his own
risk assessment, the scaffold contrac-
tor can also determine other disman-
tling options.
Dismantling takes place from top to
bottom, with personnel always in a
safe position.
Dismantling is carried out whilst pro-
gressively working back to the access
ladder bay.
PERI UP Flex Reinforcement Scaffold 75 and 100
Instructions for Assembly and Use – Standard Configuration
Dismantling procedure
1. From a position on the decking
level:
– Ledger UH 75 opposite the access
ladder (Fig. A4.01a)
– Ledger UH on the inside and Toe-
boards (Fig. A4.01b)
– Ledger UH on the outside, from a
safe position (Fig. A4.01c)
– Ledger Brace UBL - top - bottom
– Ledger UH on the inside, from a safe
position (Fig. A4.01d)
2. From a position on the ladder:
– Ledger UH outside
– Close hatch from below (Fig. A4.02)
Fig. B4.01d
Fig. B4.02
Fig. B4.01bFig. B4.01a
Fig. B4.01c
1.
1.1
1.3
1.2
1.4
2.