8 - 6
Mounting and commissioning the machine
8.03 Switching the machine on/off
● Switch the machine on or off, see Chapter 7.01 Main switch.
● Carry out a test run.
8.02 Commissioning
Before setting up, remove the
protective foil from oil glass 1!
● Clean the machine thoroughly and
afterwards check the oil level (see
Chapter 12, Care and Maintenance).
● Check the machine for any damage,
especially the electrical leads.
● Have a qualified person check whether
the motor can be driven with the existing
power voltage.
If there are any differences, the
machine must definitely not be
operated!
The machine must only be connected to a suitably earthed socket!
● When the machine is running, the balance wheel must turn towards the operator. If this is not the
case, have the motor adjusted by specialist staff, see Chapter 13.08 Parameter settings.
● Machines with pneumatic equipment have to be connected to the compressed air
supply. The pressure gauge must show a pressure of 6 bar. If necessary have this
reading adjusted (see Chapter 12.04, Checking/adjusting the air pressure).
Fig. 8 - 08