MAILBOX INSTALLATION (G909)
G065 1-26 SM
7.  Align the mailbox on the joint brackets, and lock it in place by pushing the
locking lever [A].
8.  Secure the locking lever (! x 1) and close the front door.
9.  Connect the mailbox cable [B] to the main machine.
10. Peel off the backing of the double-sided tape that is attached to the proof tray
attachment [C].
11. Install the proof tray attachment on the proof tray.
12. Turn on the main switch and check the mailbox operation.
G909I503.WMF
G909I552.WMF
[A]
[B]
[C]