EasyManua.ls Logo

Ricoh G065 - Page 59

Ricoh G065
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BRIDGE UNIT FOR MAILBOX INSTALLATION (G912)
SM 1-31 G065
Installation
15. Secure the bridge unit [A] (! x 4 - M4x8).
16. Route the cables [B] through the openings [C].
17. Route the solenoid harness [D] through the opening [E].
18. Connect the cables to the solenoid and sensors and clamp the cable as shown.
19. Reinstall the rear cover and proof tray unit.
20. Install the mailbox on the main machine (refer to the Mailbox Installation
procedure for more detail).
If installing the 3000-sheet finisher (A697), do steps 21 to 25.
21. Install the front joint bracket [F] and rear joint bracket [G] which are contained in
the finisher’s accessory box.
G912I509.WMF
G912I510.WMF
G912I513.WMF
[A]
[B]
[D]
[B]
[G]
[F]
[B]
[C]
[C]
[B]
[E]
CÓPIA NÃO CONTROLADA
CÓPIA NÃO CONTROLADA

Table of Contents

Related product manuals