Quality Control
109
10 If the control material box contains more
than one level, select the level of choice
for this measurement.
The thermometer icon shows that the test
strip is warming up. A beep tone indicates
when the warming-up process is complete,
provided the beep tone is turned on in the
settings.
The pipette icon indicates that the meter is
ready to perform the test and is waiting for the
sample to be applied.
Simultaneously, a 5-minute countdown
begins. You must apply the sample within this
time, otherwise you will receive an error
message (after the sample detection has
timed out).
In case of errors, see “Troubleshooting” on
page 127.
QC Test - Sel. QC Level
09:15 am
Level 2
Level 1
Level 3
proBNP, PB1234
LOT PBC014
JONES, TOM
Par:
Op:
Code
QC
QC Test - Warming Up
09:15 am
Level 1
Please Wait
Warming Up
proBNP, PB1234
LOT PBC014
JONES, TOM
Par:
Op:
Code
QC
QC Test - App. QC
09:15 am
Apply QC
Min
150 µL
Level 1
proBNP, PB1234
LOT PBC014
JONES, TOM
Par:
Op:
Code
QC
4:10