EasyManua.ls Logo

Rohde & Schwarz R&S VENICE S800/824-G3 - Page 75

Rohde & Schwarz R&S VENICE S800/824-G3
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Configuration
75
User Manual | 2906.2506.02 - 01
Installing the System
R&S VENICE S
8.
Insert the supplied SDI SFP coaxial dual transmitter (arrows point
outwards) and the SDI SFP coaxial dual receiver (arrows point inwards)
into the according SFP+ ports.
9. Connect the HD-BNC to BNC adapter cables to the SDI In/Out connec-
tors.
10. Connect any other peripheral computer and video equipment. An over-
view of the panels and connectors are listed in chapter “The Rear of the
System” on page 40.
R&S VENICE S is ready for first use.The R&S VENICE S hardware is now
properly installed and you can switch on the system.
In case you are installing the 12G option, consult also section
"Channel Assignment" on page 45 for the correct position of the
SFP modules.
1313
2424
SDI Out SDI In

Table of Contents