Chapter 4 Putting into Operation
5300.9677.72 - 4.22 - EN-4
3 Completing Procedure for Putting Transmitter
into Operation
When the steps described in the above sections have been carried out the transmitter is
ready to operate. Each transmitter receives a test report from the final testing department
complete with measurement data for every quality parameter. This means that on site com-
pliance testing is only necessary at the customer's request.
3.1 Checking the Status Displays
3.1.1 Checking the Transmitter Status Display
1. Select Transmitter > Status.
The Status window opens.
2. Check the status of the warning and error indicators.If a transmitter is ready to operate,
no warnings or errors will be signaled.
3.1.2 Checking the Exciter Status Displays
1. Select Transmitter > Exciter > Status > Overview.
The Status > Overview window opens.