EasyManua.ls Logo

SBM SB-3000 - 8.4.0. Machine management; 8.4.1. Program update; 8.4.3. Calibration

SBM SB-3000
253 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80
8.4.0. Machine management
8.4.1. Program update
In this mode, user can simply install new software for upgrade by USB Memory Stick.
The steps for update are as follows.
[1] With the machine on, insert USB Memory which has the file provided from service provider to the
USB B port in the machine.
[2] Chick this menu [SERVICE MENU _ Machine management/ Program update]
[3] The machine will recognize the programs automatically.
[4] User can choose the program for update
[5] Machine will be powered off and on automatically after update is done.
[6] Regarding the formatted type of USB memory, ‘FAT32 is recommended under the Windows
environment.
For more detail information, please refer to the Chapter 11.0.0.
8.4.2. Touch calibration
Touch calibration for screen
8.4.3. Calibration
In order that a system analyzes Reference Level and a signal of the machine, the system should
know the full swing of a waveform of a signal.
[What is the calibration?]
Calibration is to make a full swing reference waveform to read the full level of a signal. If the
machine rejects too many notes, the system might not analyze the input of waveform. It is possible
to make a standard waveform for the system. For more detail information, please refer to the
Chapter 9.0.0.
■ Batch Progress: Batch
MR calibration
Tape calibration
CIS calibration
UV calibration
You have to do the calibration on the below situation.
1. When you disassemble and assemble the sensors related
2. When you change the parts of MR/ Tape/ CIS/ UV
3. When you change the Image Board
4. When you update S/W

Table of Contents