EasyManuals Logo

Sea-doo 2012 Sea Doo RXT series User Manual

Sea-doo 2012 Sea Doo RXT series
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #131 background imageLoading...
Page #131 background image
MAINTENANCE SCHEDULE
25 HOURS OR 3 MONTHS
50 HOURS OR 6 MONTHS
100 HOURS OR 1 YEAR
200HOURSOR2YEAR
A: ADJUST
C: CLEAN
I: INSPECT
L: LUBRICATE
R: REPLACE
O: OPERATOR
D: DEALER
TO BE PERFORMED BY
PART/TASK NOTE
iBR SYSTEM (intelligent Brake and Reverse)
iBR lever
(3)
I, L O/D
iBR gate backlash I D
iBR support plates I D
iBR friction sleeves R D
iBR connecting arms, sleeves and bushings I D
iBR U lever, VTS trim ring, iBR gate and
bushings
ID
iBR U arm retaining screws
I
(4) (9)
D
iBR protective guard I D
(3)SeeNOTE2after
maintenance chart.
(4) At storage period or
after 100 hours of use
whichever comes first.
(9) See NOTE 3 after maintenance
chart.
iS SYSTEM (intelligent Suspension)
iS oil
(7)
ID
iS position sensor I D
(7) Check pump reservoir oil level
and for system leaks.
aS SYSTEM (adjustable Suspension)
Nitrogen remote reservoir (adjustment knob,
mounts)
ID
HULL AND BODY
Hull I O
Ride plate and water intake grate I O
NOTE 1: The supercharger clutch requires replacement when the “MAINTENANCE SUPERCHARGER”
message is displayed in the information center, at every 100 hours of operation or earlier
depending on the riding style (speed, engine RPM, water conditions). This is determined by the
engine management system. The supercharger clutch will need to be replaced within 5 hours of
the message display by an authorized Sea-Doo dealer. The supercharger maintenance reminder
must be reset using B.U.D.S. in order to reset the supercharger maintenance hour counter, even if
the maintenance was carried out before the reminder appeared in the information center.
NOTE 2: The iTC and iBR levers should be inspected by depressing and releasing the levers to check for
freedom of movement. If any friction is felt, the lever must be taken apart, cleaned, inspected for
wear and lubricated by an authorized Sea-Doo dealer.
NOTE 3: Ensure proper torque of iBR U arm to iBR actuator shaft retaining screws. If retaining screws found
loose, do not re-torque them. Replace them with new ones.
______________
129

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sea-doo 2012 Sea Doo RXT series and is the answer not in the manual?

Sea-doo 2012 Sea Doo RXT series Specifications

General IconGeneral
BrandSea-doo
Model2012 Sea Doo RXT series
CategoryBoat
LanguageEnglish

Related product manuals