Doc# E166703 5-21
5: Communicating with the Meter
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
after you click Change Password. Enter the old password and click OK to
proceed with the password change.
• Change the MP200 metering system’s identification label: input a new label for the
MP200 unit into the CPU Identifier field.
• Enter a name for the eight meters in a three phase circuit configuration, or the 24
meters in a single phase circuit configuration, so that you can easily identify each
meter’s information. These names are used throughout the software, e.g., in the
logging and polling screens.
For example, if you have a shopping mall with 8 stores, each having a three phase
system that is attached to the MP200-Y, you can name the meters Store 1 - Store
8, to identify each meter with its store. Then when you look at the polling screens
or logging screens, you can easily identify each store’s data, without needing to
check the circuit configuration.