EasyManua.ls Logo

SICK DUSTHUNTER T

SICK DUSTHUNTER T
552 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GM35 Operating Instructions
Probe Model
Maintenance
74 © SICK MAIHAK GmbH • Germany · All rights reserved 8009389/07-2006
8.5 Evaluation Unit
The Evaluation Unit is designed for maintenance-free operation over the entire service life
of the measuring system. If the Evaluation Unit is mounted outdoors, the following simple
checks should be carried out regularly:
Visual inspection:
Is the housing or mounting intact?
Can the front door of the housing be opened and closed easily?
Is the window on the housing free of humidity
Is the LCD on the Evaluation Unit functioning correctly?
Exposed electrical connections
The electrical connections are exposed when the door on the Evaluation Unit is open.
Follow the relevant safety instructions.
Open the door on the Evaluation Unit and check the following:
Are the cable connections o.k.?
Is the inside of the housing dry?
If you did not answer "yes" to one of the questions in this Chapter (8.5):
Locate the cause.
Carry out the necessary repairs.
If the Evaluation Unit is damaged (for example, LCD failure):
Contact the Service department at SICK MAIHAK GmbH or your local sales representa-
tive.

Table of Contents

Related product manuals