EasyManua.ls Logo

SICK DUSTHUNTER T50

SICK DUSTHUNTER T50
261 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Basic Operation
8
3 Basic Operation
3.1 Preparation for Operation
Q Wiring check
Confirm that the wiring is correctly given according to the separate installation manual.
Q Gas sample/ discharge piping check
According to the separate installation manual, confirm that the sample piping has secure
connection and the discharge piping is free from malfunction such as bending.
Q Drain trap watering
There are 2 tubes requiring watering.
Connect the attached watering pot to the soft tube of 16 mm O.D. (tube 1 and tube 2 in the
figure below) and start watering gradually.
Continue watering until the water starts being discharged from the drain trap 2 (lower drain
trap).
Fig. 6 Drain trap watering
Q Connecting calibration gas cylinder and tubes
Connect the standard gas cylinder pressure regulator to the calibration gas cylinder by
referring to " 7.3.12 Replacing the gas cylinder (pressure regulator inspection) " (page 72).
Connect the calibration gas line pipes to the standard gas cylinder pressure regulator.
Perform leak check by referring to " 7.3.12 Replacing the gas cylinder (pressure regulator
inspection) " (page 72).
After the leak check, close the needle of pressure regulator.
Tube 1
Disconnect the tube from the upper of cabinet,
Connect the watering pot
Tube 2
Electric cooler fan
Electric cooler power lamp
connect the watering pot to start water supply.
(green LED on the board)
to start the water supply

Table of Contents

Related product manuals