EasyManua.ls Logo

SICK DUSTHUNTER T50

SICK DUSTHUNTER T50
261 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Maintenance
56
7.2 Periodical Inspection
7.2.1 Inspection every 1 to 6 months
Q Sampling point
Q Sampling system
Q Cabinet
Note
For replacement and cleaning of each part, refer to " 7.3 Maintenance of Sampling Devices " (page 61).
CAUTION
The primary filter reaches temperatures as high as 120ºC.
When checking the filter, be sure to use gloves to avoid burns.
CAUTION
The temperature of the heating pipe is adjusted to 120ºC.
Be careful when inspecting the system.
Check item Inspection cycle Content of inspection and action Reference
Primary filter
Filter element 1 month Replace
page 61Holder cap 3 months Replace
O-ring 6 months Replace after applying Dyflon grease
Heated tube (piping) 3 months
If clogging is found, clean it by instrumental air. (Be
sure to clean it with the inlet tube disconnected.)
Probe 3 months Clean the clogging and dirt
Check item Inspection cycle Content of inspection and action Reference
Secondary filter 1, 2 1 month Replace page 62
Halogen scrubber
(waste incinerator specification)
1 month
Discoloration check
Replace if discolored
page 63
Mist catcher 2 months Replace page 63
Pump1, 2 6 months Replace the diaphragm page 65
Electronic cooler 6 months Clean the radiating fin and fan
Check item Inspection cycle Content of inspection and action Reference
Ventilation filter 3 months
Clean if dirty
Replace if deteriorated
page 66

Table of Contents

Related product manuals