0.0
syngo CT 2007E Emotion Operator Manual
02/2008
0.0
Operation of the Patient Table System Handling
C.2-10
Moving the table top vertic ally
C.2
You can use the hand crank at the bottom of the table to move
the table up or down manually.
C.2
C.2
(1) Hand crank
(2) Hand crank under the patient table
(3) Hole for the hand crank
✧ Insert the hand crank into the matching hole below the
table as far as it will go.
✧ Crank the table up or down.