EasyManuals Logo
Home>Simrad>Sonar>FS 70

Simrad FS 70 User Manual

Simrad FS 70
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #79 background imageLoading...
Page #79 background image
FS 70 Installation Instructions
974-24007001/5.0 69
4.3 System Set-up and Testing using the test
cable
Initial power-up, set-up and test of the system should be made with the trawl unit connected
to the PWR/TTM module using the supplied test cable. The 3-pin MS connector of the test
cable is attached to the connector labelled “TEST CABLE” located on the front panel of the
PWR/TTM unit. The other end of the test cable is plugged into the 2-pin connector on the
sonar head of the trawl unit.
4.3.1 FS Processor & TTM Communication Set-Up
The commnunication between the FS Processor and the TTM unit can be achive 3 ways
depending on the type of communication ports available in the processor unit:
1. If standard serial COM ports are available you may use a RS232 Null Modem cable,
KML part number 144-0217, supplied with the processor.
2. If USB ports are available then use the USB/RS232 telemetry converter, KML part
number 901-80010000, supplied with the processor.
4.3.2 Start Up
1. Check that the system has been properly installed and that all connections have been made
to the PWR/TTM and the Processing Unit.
2. First turn on the PWR/TTM interface module. The voltmeter should display
approximately 120 volts if on “120VDC” setting, 200 volts if on the “200VDCsetting
and approximately 60 volts if on “TEST” setting. The current meter should read
approximately 0.15 0.7 amps.
3. Next turn on the display monitor, and then turn on the processing unit. The system will
start up automatically.
4.3.3 Power-Up Configuration
For the system to operate properly the trawl unit configuration must be selected correctly.
In addition, modification of these power-up configuration parameters is done in a special
mode selected after power-up of the Processor unit.
The following sections describe the process of configuring these parameters. These steps
must be followed only when the system is powered-up for the first time or when you have to
replace the Processing unit or the TTM Module assembly.
4.3.4 Selecting the Trawl Output Voltage
You must select the proper trawl voltage in accordance with the underwater trawl unit system
you are using,

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simrad FS 70 and is the answer not in the manual?

Simrad FS 70 Specifications

General IconGeneral
BrandSimrad
ModelFS 70
CategorySonar
LanguageEnglish

Related product manuals