EasyManua.ls Logo

Subaru 2002 Impreza - Page 429

Subaru 2002 Impreza
598 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DIAGNOSTIC PROCEDURE WITH DIAGNOSTIC TROUBLE CODE (DTC)
E
NG
I
N
E
(
D
I
AG
NOSTl
CS)
Step
CHECK OUTPUT SIGNAL FROM ECM.
1)Turn the ignition switch to
ON.
2)Measure the voltage between ECM and
chassis ground.
Connector
&
terminal
(B
137)
No.
16
(+)
-
Chassis ground
(-):
!
CHECK HARNESS BETWEEN PURGE CON.
TROL SOLENOID VALVE AND ECM CON-
NECTOR.
1)Turn the ignition switch to
OFF.
2)Disconnect the connectors from purge con-
trol solenoid valve and ECM.
3)Measure the resistance
of
harness between
purge control solenoid valve connector and
engine ground.
Connector
&
terminal
(E4) No.
2
-
Engine ground:
1
CHECK HARNESS BETWEEN PURGE CON,
TROL SOLENOID VALVE AND ECM CON-
NECTOR.
Measure the resistance of harness between
ECM and purge control solenoid valve of har-
ness connector.
Connector
&
terminal
(6137)
NO.
16
-
(E4)
NO.
2:
I
CHECK PURGE CONTROL SOLENOID
VALVE.
1)Remove the purge control solenoid valve.
2)Measure the resistance between purge con-
trol solenoid valve terminals.
Terminals
NO.
1
-NO.
2:
>
CHECK POWER SUPPLY TO PURGE CON-
TROL SOLENOID VALVE.
1)Turn the ignition switch to ON.
2)Measure the voltage between purge control
solenoid valve and engine ground.
Connector
&
terminal
(E4)
No.
1
(+)
-
Engine ground
(-):
Check
5
the voltage more than 10
V?
s
the resistance less than 10
2?
s
the resistance less than
1
2?
s
the resistance between 10
2nd
100
Q?
s
the voltage more than 10
V?
Yes
Even
if
MIL lights
up, the circuit has
returned to a nor-
mal condition at
this time. Contact
with
SOA
(distribu-
tor) service.
NOTE:
Inspection by DTW
is required, be.
cause probable
cause is deteriora,
tion
of
multiple
parts.
Repair ground
short circuit in har-
ness between
ECM and purge
control solenoid
valve connector.
Go
to step
4.
20
to step
5.
;o
to step
6.
No
So
to step
2.
20
to step
3.
3epair open circuit
n
harness
letween ECM and
)urge control sole-
ioid valve connec-
or.
rlOTE:
n this case, repair
he following:
Open circuit in
iarness between
XM and purge
:ontrol solenoid
ialve connector
Poor contact in
:oupling connectoi
3eplace the purge
:ontrol solenoid
ialve. <Ref.
to
IC(D0HC
TURBO)--/,
Purge
2ontrol Solenoid
Jake.>
3epair open circuit
n harness
letween main
'elay and purge
:ontrol solenoid
ialve connector.
EN(D0HC TURBO)-205

Table of Contents