EasyManuals Logo

Suzuki DF 60 Service Manual

Suzuki DF 60
283 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #101 background imageLoading...
Page #101 background image
ENGINE CONTROL SYSTEM 3-53
1
1. Sealing tape
OIL PRESSURE SWITCH
REMOVAL
1. Remove the ECM from the electric parts holder.
2. Loosen the bolt and disconnect the switch wire (Blue).
3. Remove the oil pressure switch from the cylinder block.
INSTALLATION
Installation is reverse order of removal with the special attention
to the following steps.
+ Oil pressure switch: 13 N
.
m (1.3 kg-m, 9.5 lb-ft)
NOTE:
Prior to installation, wrap the oil pressure switch thread with
sealing tape. If the sealing tape edge is bulged out from the thread,
cut off the excess.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki DF 60 and is the answer not in the manual?

Suzuki DF 60 Specifications

General IconGeneral
Cylinders3
SteeringRemote
Starting SystemElectric
Max Power Output60 hp
Trim MethodPower Trim and Tilt
Engine Type4-stroke
Displacement941 cc
Fuel Delivery SystemSequential Multi Point Fuel Injection
Maximum Output60 HP
Full Throttle Operating Range5, 300 - 6, 300 rpm
Recommended FuelUnleaded gasoline
ExhaustThrough propeller hub
Cooling SystemWater-cooled
Warranty3-year limited warranty

Related product manuals