EasyManua.ls Logo

Suzuki DF 60 - Installation

Suzuki DF 60
283 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POWER UNIT 6-5
INSTALLATION
Installation is reverse order of removal with the special attention
to the following steps.
!
Do not re-use the gaskets once removed. Always use
new gaskets.
Install the two dowel pins 1 and the gaskets 2.
Apply the thread lock to the two bolts as shown.
"99000-32050: THREAD LOCK “1342”
Tighten the eight bolts and the three nuts according to the
numerical order as shown.
# Intake manifold bolt/nut: 25 N
.
m (2.5 kg-m, 18.0 lb-ft)
Install the fuel injector and the delivery pipe.
CHECKING
Check hose routing. (See the page 10-8 to 10-12.)
Check wire routing. (See the page 10-2 to 10-7.)
Check for fuel leakage and water leakage.

Table of Contents

Related product manuals