EasyManua.ls Logo

Suzuki DF 60 - Ptt Motor Relay

Suzuki DF 60
283 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POWER TRIM AND TILT 8-17
PTT MOTOR RELAY
Two methods can be used to test the PTT motor relays.
Method 1.
Measure the resistance between the two lead wires of the relay.
$ 09930-99320: Digital tester
* Tester range:
(Resistance)
Method 2.
1. Inspect the relay operation using a battery (12V) as follows:
$ 09930-99320: Digital tester
% Tester range:
&&
&&
& (Continuity)
(1) Without the lead wires connected to the battery, there should
be continuity between the terminals 1, 2 and 3 but should
be no continuity between the terminals 3 and 4.
(2) With the Black lead wire connected to the battery negative -
terminal and the Light blue (or Pink) lead wire connected to
the battery positive + terminal, there should be continuity
between the terminals 2, 3 and 4.
2. The relay is considered to be without defect if the continuity
test results are as stated the above.
PTT motor relay solenoid coil resistance: 3.0 – 4.5
Lbl(P)
CONT
1
2
3
4
Lbl(P)
B
12V BAT.
1
2
3
4
B
Tester probe connection
Red
++
++
+ Black
--
--
-
UP relay Light Blue Black
DOWN relay
Pink
Black
PTT motor relayPTT motor relay
B
Lbl(P)

Table of Contents

Related product manuals