EasyManua.ls Logo

Suzuki VL800 - Page 588

Suzuki VL800
639 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18-48 VL800/C/TK9 (’09-MODEL)
Apply thin coat of engine oil to the new O-rings and cushion
seals.
Install the fuel injector 4 by pushing it straight to the delivery
pipe 5.
NOTE:
Align the coupler E of the injector with the groove F of the
delivery pipe.
Install the fuel delivery pipes 6 to the throttle body.
Tighten the fuel delivery pipe mounting screws to he speci-
fied torque.
Fuel delivery pipe mounting screw:
3.5 N·m (0.35 kgf-m, 2.5 lbf-ft)
Replace the O-rings and cushion seals with the new
ones.
Never turn the injector while pushing it.
Never turn the fuel injectors while installing them.

Table of Contents

Other manuals for Suzuki VL800

Related product manuals