19
2. Installation
Follow these procedures to install the TD-9000T in a control
panel.
1 Open a hole in the panel in accordance with this
dimensional drawing of the panel installation
opening.
92
+1
0
+1
Panel installation opening
dimensions
Recommended panel
thickness: 1.6–3.2mm
2 Remove the screws in two locations. Then, remove
the left and right guide rails.
Guide rail
Screws
Guide rail
3 Insert the TD-9000T through the front of the panel.
4 From the back, attach the guide rails removed in
step 2 and secure them using screws in two places.
(Recommended tightening torque: 0.5N·m ≈ 5.1kgf·cm)
o Do not use any screws other than those included
with the TD-9000T.