Section 3: Create a new project and test 4200A-SCS Parameter Analyzer User's Manual
3-8 4200A-900-01 Rev. D/April 2020
3. Set the Gate terminal connection to SMU2.
4. Set the Operation Mode to Voltage Step.
5. Change the Start, Stop, Step, and Compliance settings to match the next figure or to the gate
settings appropriate for your device.
Figure 23: SMU2 steps from 2 V to 5 V, connected to MOSFET Gate terminal
6. Set the Drain terminal connection to SMU1.
7. Set the Operation Mode to Voltage Linear Sweep.
8. Change the Start, Stop, Step, and Compliance settings to match the next figure.
Figure 24: SMU1 sweeps from 0 V to 5 V, connected to MOSFET Drain terminal
9. Set the Operation Mode of the Source terminal to GNDU.
ООО "Техэнком" Контрольно-измерительные приборы и оборудование www.tehencom.com