CAUTION
Preventpersonalinjuryand/ordamagetoequipment.Readall
WARNINGS,CAUTIONSandPrecautionsforHydraulicTestingatthe
beginningofthissection.
ProcedureforCuttingDeckCircuitReliefPressureTest
1.Makesurehydraulicoilisatnormaloperatingtemperature(54to66ºC(130
to150ºF))byoperatingthemachineforapproximatelyten(10)minutes.
Makesurethehydraulictankisfull.
2.Parkmachineonalevelsurface,lowercuttingdecksfully,disengagePTO,
engageparkingbrakeandstopengine.Removekeyfromkeyswitch.
g287771
Figure61
1.Frontdeckmanifold3.RHdeckmanifold
2.LHdeckmanifold
g302920
Figure62
1.Leftdeckmanifold
2.PRVvalve
3.LocatedeckmanifoldforthecuttingdecktobetestedFigure61).Disconnect
hydraulichosefromttingindeckmanifoldportM1.
HydraulicSystem:Testing
Page5–54
Groundsmaster
®
5900&5910
16227SLRevB