EasyManua.ls Logo

Toro Reelmaster 5100-D - Page 259

Toro Reelmaster 5100-D
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26. Remove and discard the commutator seal from the
commutator cover (Fig. 44).
Figure 44
27. Remove the eleven hex socket head screws, that
hold the metering package together (Fig. 45). Use a
3/32 in. allen wrench. Inspect the screws for thread and
socket damage and replace as necessary.
Figure 45
28. Lift the commutator cover from the metering pack-
age (Fig. 46).
29. Inspect the ground surfaces of the commutator
cover. You should notice a “normal” polished pattern due
to the rotation of the commutator. If the cover has nicks,
burrs, or scoring, it must be replaced.
Figure 46
Reelmaster
®
223-D/5100-D/5300-D Page 7 - 29 Repairs

Table of Contents

Other manuals for Toro Reelmaster 5100-D

Related product manuals