EasyManua.ls Logo

Toro Reelmaster 5100-D - Page 279

Toro Reelmaster 5100-D
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39. Put the port manifold (three plates bonded together),
valve side up, in a clean surface. Install three 3/4 in.
springs into the spring pockets (Fig. 103).
40. Apply a few drops o
f oil to the valve plate. Align the
grooves on the side of the port manifold with the grooves
on the side of the isolation manifold and assemble the
port manifold with the springs toward the valve plate
(Fig. 104). Be careful not to pinch a spring during
installation. The two alignment pins in the valve plate
will engage the holes in the port manifold. The pin on
the hex drive assembly must engage the center hole in
the port manifold.
41. Install a new o-ring on the plug. Insert the check ball
h
ole in the port cover. Be sure the ball is seated in the
bottom of the check ball hole. Turn the plug assembly
into the port cover until the ball is retained (Fig. 105).
Figure 103
Figure 104
Figure 105
Reelmaster
®
223-D/5100-D/5300-D Page 7 - 49 Repairs

Table of Contents

Other manuals for Toro Reelmaster 5100-D

Related product manuals