EasyManua.ls Logo

turck BL20 - Page 69

turck BL20
461 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D301087 0308 - BL20 CANopen 3-29
Status Indicators/ Diagnostic Messages Gateway
3
IOs Red and
LED
"GW"
off
Controller is not ready,
V
CC
level is not within
the required range
possible reasons:
too many modules
connected to the
gateway
short circuit in
connected module
hardware error in
gateway
Check wiring at the
gateway and the
voltage supply.
Dismount modules
Replace the gateway.
Red
flashing,
1 Hz
Non-adaptable modifi-
cation of the physically
connected station.
Compare the planned
BL20 station with the
physical station.
Check the physical
station for defective or
incorrectly fitted elec-
tronics modules.
Red
flashing,
4 Hz
no module bus
communication
At least one module has
to be plugged and has to
be able to communicate
with the gateway.
Red/
green
flashing,
1 Hz
Adaptable modification
of the physically
connected station;
data transfer possible
Check the physical
station for pulled or new
but not planned
modules.
Red Short circuit or over-
load at sensor supply
sensor supply is
switched off
Automatic restart when
debugging.
Off No voltage supply. Check the wiring of the
voltage supply.
Table 11:
LED indicators
LED Status Meaning Remedy

Table of Contents

Related product manuals