EasyManua.ls Logo

Tuttnauer 5050 - Service and Maintenance Procedures

Tuttnauer 5050
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 85
11 Service and Maintenance Instructions
11.1 Preventive and Scheduled Maintenance
The maintenance operations described in this chapter must be fulfilled
periodically to keep the device in good condition and to reduce the
breakdown time to a minimum.
The user maintenance personnel can easily execute these operations
in accordance with further instructions.
The owner of the autoclave is responsible to order an authorized
technician to perform the periodical tests and preventive maintenance
operations, as specified in the technician manual.
Use only mineral-free water as detailed in sec. 3.2 (water quality).
Warning!
Before carrying out any preventive maintenance operation, ensure
that the electrical cord is disconnected and that there is no
pressure in the autoclave.
Daily
Clean door gasket with a soft cloth. The gasket should be clean and
smooth.
Weekly
1. Once a week clean and descale the chamber, copper tubes and the
reservoir.
Caution
Do not use steel wool or steel brush as this can damage the
chamber!
2. Put a few oil drops on the 2 door pins and door tightening bolt.
3. Clean the outer parts of the autoclave with a soft cloth.
4. Once a week, or after 20 cycles (whichever comes first), drain the
water from the reservoir, and refill with fresh mineral-free water or
distilled water.
5. Clean the electrode with a soft cloth.
DOMINIQUE DUTSCHER SAS

Table of Contents

Other manuals for Tuttnauer 5050

Related product manuals