Tyco Electronics Galaxy SC Controller J85501F-1
Issue 13 February 2001 Table of Contents - 5
System Software 4 - 63
System Time 4 - 63
Timer Events 4 - 64
Configuration From a Remote Terminal 4 - 64
T1.317 Command Language 4 - 64
Connecting a Terminal to Galaxy SC 4 - 64
5 Acceptance Testing
Introduction 5 - 1
Tools and Test Equipment 5 - 1
Precautions 5 - 1
Lamp Test 5 - 1
Alarm Test 5 - 2
Local Alarm Test 5 - 2
Remote Alarm Test 5 - 3
High Float Voltage Alarm (Serial Rectifiers) 5 - 3
New Installations (Serial Rectifiers) 5 - 3
Installations Serving An Active Plant Load (Serial Rectifiers) 5 - 4
High Voltage Shutdown - New Installations Only
(Serial Rectifiers) 5 - 4
High Voltage Alarm/High Voltage Shutdown Alarm
(Parallel Rectifiers) 5 - 7
New Installations (Parallel Rectifiers) 5 - 7
Installations Serving an Active Plant Load
(Parallel Rectifiers) 5 - 8
Batteryless Plant HVSD Test (Serial Rectifiers) 5 - 9
Battery on Discharge Alarm 5 - 10
Rectifier Fail Alarm 5 - 10
Terminate Rectifier (TR) Test 5 - 12
Fuse Alarm Tests 5 - 12
Major Fuse Alarm 5 - 12
Minor Fuse Alarm 5 - 13
Modem/Data Switch 5 - 13
Remote Peripheral Monitoring 5 - 13
Rectifier Sequencing 5 - 13
Energy Management 5 - 14
Meter Calibration From the Front Panel 5 - 14
Voltage Calibration 5 - 14
Current Calibration 5 - 15
6 Operation
Introduction 6 - 1
Basic Controller’s Front Panel Operation 6 - 1
Alarm Cut Off 6 - 1