Vertiv | NetSure™ 8200 Series -48 VDC Power System Installation Manual (IM582140000) | Rev. A
b) Route the cable through the opening provided in the side of the bay into the next bay. If PDSCs
(AC Input 'Power Distribution Service Cabinets') are provided, route the cable through the metal
channel provided in the PDSC and into the next bay.
c) Connect the other end of the cable to the incoming CAN port connector in the secondary
power/distribution bay or secondary power only bay or distribution only bay. If there are additional
bays, connect the outgoing CAN port of this bay to the incoming CAN port of the next bay. See
Figure 78. Daisy-chain all secondary power/distribution bays or secondary power only bays and
distribution only bays together in this fashion. The total length of the interconnect cables used
cannot exceed 125 feet. Note that if there are bays on both the right and left of the primary
power/distribution bay or primary power only bay, once all bays on one side are connected, you
have to take a cable from the last bay connected on that side to a bay on the other side of the bay
line-up.
3. If no other connections are required within the bays, close all bays' front doors.