EasyManua.ls Logo

Vertiv SmartCabinet - 5.2.2. UPS & Power distribution servicing

Vertiv SmartCabinet
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Vertiv | SmartCabinet | User Manual 136
General Maintenance
Table 5-1
SmartCabinet AC
Date: Prepared by:
Model: Serial Number:
Type Maintenance Components Item Result
Monthly Filter Checkforrestrictairow
Checkthelter
Cleanthelter
Indoor unit fan Bearings in good condition
Drain system Check and clean out unit drain pipes
Semi-
annually
Compressor Signs of oil leaks
Vibration isolation
Refrigerant system Suction pressure
Discharge pressure
Superheat
Evaporator in tight and clean condition
Charging capacity of refrigerant
Evidenttemperaturedierencebetweenbefore
andafterthelterdrier
Air-cooled condenser Condenser coil is clean
Motore mounted tightly
Bearing in good condition
Refrigerant pipe properly supported
Electric board Check electrical connections
Check the surface for signs of corrosion
Notes:
Signature:
5.2.2. UPS & Power distribution servicing
The general maintenance for the UPS & Power Distribution system includes Fan Maintenance and Checking
the UPS status.
Fan Maintenance
The UPS fans are intended to run for 20000-40000 hours continuously. The higher the environmental
temperature is, the shorter the fan life tends to be. Verify the fan status periodically on a half-yearly basis
bycheckingiftheairowfromtheventilationholesontherearpaneloftheUPSisappropriateandis
functioning normally.

Table of Contents

Related product manuals