System Installation
Chapter 2: System Installation
The Installation process consists of the following procedures, namely:
• Pre-installation
• Site Preparation
• Installation
2.1. Pre-installation
Pre-installation contains the following 3 sub-sections, namely:
• Transportation & Movement
• Unpacking
• Inspection
• Prior to installation, some aspects need to be taken into consideration from the safety point of view.
• The components of the SmartCabinet containment are large and heavy. Therefore, there may be a risk
when the containment collapses. The collapse may result in physical injury, fatality, and damage to the
equipment.
• Read all the guides pertaining to the SmartCabinet system before unpacking, moving, or placing the
components. Read the labels on the SmartCabinet unit carefully to understand the safety measures prior
to handling the containment.
• The center of gravity of SmartCabinet is inclined a bit forward, therefore, during conveying process ad-
just the bearing position of the forklift or hand pallet truck.
• The sharp edge, sharp angle of the object, and bare buckle can result in severe injury. Therefore, only
trained and qualied personnel must be allowed to install, maintain, and operate the unit. Wear safety
shoes, recommended helmets, gloves, shoes, and glasses before moving the components and functional
parts, removing the packaging of the containment, or installation.
• The cabinet may be too high to pass through the door together with the pallet. Verify the height of the
cabinet and the door followed by conrming the clearance before moving the equipment; this will help
prevent damage to the equipment and the building.
• Close all the doors while lifting the equipment using an electric forklift or a pallet.