EasyManua.ls Logo

VHF Z4 - 5 Installing the machine

VHF Z4
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Installing the machine
Checking the scope of delivery
Unpack the machine and ensure that you have
received the following items:
1 2 3
4 5 6 7
8 9 10 11
12 13 14 15
16 17 18 19
1.
1x Machine Z4
2.
1x Cleaning brush
3.
5x Tool magazine inserts
4.
1x Power cable
5.
1x Ethernet network cable(type: straight)
6.
1x Spindle service set
7.
1x Interdental brush(for cleaning the nozzle plate)
8.
1x Blank holder service set
9.
1x Tube of collet chuck grease (for spindle, blank
holder, tool magazine holder)
10.
5x Tool magazines (in the drawer)
11.
1x Measuring pin
12.
1x Drill bit for tool positions (2.8 mm)
13.
1x Calibration set: 1 micrometer, 5 blanks for man-
ufacturing test and calibration specimen
14.
1 x Microfiber cloth
15.
1 x View window wiper
16.
1 x Container with activated carbon pellets
17.
1 x Fine filter
18.
3 x Fixing screw for the collet chuck of the blank
holder
19.
5 x Tool magazine caps
Not depicted:
n
This document
n
1 x Carrying aid for transporting the machine
n
1 x Transport lock in the working chamber
n
1 x Supplement about removing the carrying aid
and transport lock
n
1 x Transport protection cover in the multi-pur-
pose drawer
n
1 x Allen key for the tool magazine release screw
n
1 x Allen key for the holder of the view window
wiper
Store the measuring pin and the calibration set
safely near the machine. Customer service will
need them for maintenance.
Keep the packaging of the machine, the carrying
aid and the transport lock for future transports.
Z4 Installing the machine
EN 15
Original Operating Instructions:Z4
Version: 12/5/2018

Table of Contents

Related product manuals