9.6 Do a test of the exhaust waste valve
Periodicity
Description
Weeks 1
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 0.2 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic 1
Support equipment
Description Part No. CSN QTY
None
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
None
PRELIMINARY OPERATIONS
This procedure is only applicable, if the engine has operated for a long period at low load
with the exhaust waste valve closed.
The engine load must be less than 70%, or the engine can be stopped.
X92DF
AA00-8135-00AAA-320A-A
Operation Manual Do a test of the exhaust waste valve
Winterthur Gas & Diesel Ltd.
- 502 - Issue 002 2020-08