EasyManua.ls Logo

WinGD X92DF - Running-in of New Components - General

WinGD X92DF
608 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.7 Running-in of new components - general
After an overhaul or an installation of new components of the piston running system, WinGD
recommends a running-in procedure. This makes sure a correct film of cylinder oil on the piston
running system is built. The procedure includes a temporary higher feed rate, refer to Figure
9-3.
WinGD recommends an inspection of the cylinder liners and of the piston rings after 24
operation hours and after 72 operation hours (001, Figure 9-3). For this running-in procedure it
is not necessary to have a special loading up apart from vessel specific loading up protocols.
Fig 9-3 Feed rate adjustments - running-in
001
001
X92DF
AA00-0000-00AAA-950B-A
Operation Manual Running-in of new components - general
Winterthur Gas & Diesel Ltd.
- 504 - Issue 002 2020-08

Table of Contents

Related product manuals