Commissioning
56 | WOLF GmbH 3066501_201910
Find and x the leak.
Measure the CO
2
level again.
CO
2
level remains below 0.2%, no leak in the ue system:
End emissions test mode
The heat generator shuts down.
Close the test ports. When doing so, ensure the caps are seated rmly!
6.9 Conguringtheheatgenerator
Standard settings for heat generator on the control module.
Set parameters (7.1 Parameter list).
6.10 Finishing the commissioning process
Document values in “System and operator's log”.
Complete commissioning report (12.1 Commissioning report).