Installation
30 | WOLF GmbH 3066501_201910
5 Installation
5.1 Transportingtheboiler/straticationcylinder
Transport the heat generator and cylinder with packaging and pallet.
A sack truck is a suitable for this.
Fig. 5.1 Transportingtheboiler/straticationcylinder
► Position a sack truck at the rear of the heat generator and cylinder.
► Place a strap around the heat generator.
► Transport to the installation site.
► Remove strap and packaging.
► Remove the xing screws on the pallet.
► Lift the heat generator and cylinder off the pallet.
5.2 Checking the delivery
The following parts are included with the COB-2 and COB-2-TS:
Standard delivery COB-2 COB-2-TS
COB-2-15/20/29/40 oil condensing boiler ● ●
TS-15/20/29 stratication cylinder - ●
Trap with hose ● ●
Stainless steel cleaning brush ● ●
Maintenance tools ● ●
COB-2 / COB-2-TS installation instructions ● ●
COB-2 / COB-2-TS operating instructions ● ●
COB-2 / COB-2-TS service instructions ● ●
Oil lter insert 40 μm ● ●