EasyManua.ls Logo

Wolf COB-2 - Installation Procedures

Wolf COB-2
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
30 | WOLF GmbH 3066501_201910
5 Installation
5.1 Transportingtheboiler/straticationcylinder
Transport the heat generator and cylinder with packaging and pallet.
A sack truck is a suitable for this.
Fig. 5.1 Transportingtheboiler/straticationcylinder
Position a sack truck at the rear of the heat generator and cylinder.
Place a strap around the heat generator.
Transport to the installation site.
Remove strap and packaging.
Remove the xing screws on the pallet.
Lift the heat generator and cylinder off the pallet.
5.2 Checking the delivery
The following parts are included with the COB-2 and COB-2-TS:
Standard delivery COB-2 COB-2-TS
COB-2-15/20/29/40 oil condensing boiler
TS-15/20/29 stratication cylinder -
Trap with hose
Stainless steel cleaning brush
Maintenance tools
COB-2 / COB-2-TS installation instructions
COB-2 / COB-2-TS operating instructions
COB-2 / COB-2-TS service instructions
Oil lter insert 40 μm

Table of Contents

Related product manuals