Manual 37278B GCP-30 Series - Genset Control
© Woodward Page 71/174
Breaker Logic "OPEN TRANSIT." [GCP-32]
Open transition (break-before-make/change over logic) is enabled via configuration of Parameter 126 to "OPEN
TRANSIT.".
In t
he event of an engine add-on request, a change is made from mains to generator supply. The following oc-
curs:
• The MCB is opened
• The GCB is closed
After the engine shed-off request has been issued, a change is made from generator to mains supply. The follow-
ing occurs:
• The GCB is opened
• The MCB is closed
Breaker Logic "EXTERNAL"
External breaker logic is enabled via configuration of Parameter 126 to "EXTERNAL".
All b
reaker control must be carried out via master controller (e.g. a PLC). The GCP controller will only issue
opening and closing pulses to the MCB and GCB when in the MANUAL operating mode. The GCP controller
always issues the breaker open command under fault conditions.