HB700 | CPU | PMC921xEx | en | 24-04 217
Checklist commissioning, parametrization and validation
C Checklist commissioning, parametrization and validation
Checklist
Run.
No.
Requirement fulfilled Notes
3 Commissioning yes no
3.1 Is guaranteed that all safe communication participants
of a system have a clear safe device address (F-
address)?
This is valid also for participants, which belong to dif-
ferent safety controllers, if the controllers are connected
by gateways (e.g. Ethernet).
3.2 Was the cycle time T
CI
of the safety CPU determined
and adjusted in the safety CPU? ⮫
‘Cycle time T
CL
safety CPU’...page 134
3.3 Was the maximum response time with the adjusted
cycle time T
CI
proofed by calculation? ⮫
‘Response
times’...page 131
3.4 Were the device parameters of the safety I/O modules
validated? ⮫
‘Validation of the system’...page 121
3.5 Was the correct project selected?
3.6 Was a review of the safety programme done?
3.7 Were the project data copied on a memory card?
3.8 Was a complete functional test accomplished and docu-
mented?
3.9 Was your engineering project documented and
archived legally compliant?
3.10 Was the service personnel instructed into the handling
of the control system?
Date:.........................Name: ...................................Sign: ......................................................